32.8 MW Project located south of Vauxhall, AB. The site consists of approximately 81,000 modules on a tracking system that adjusts its tilt throughout to day to follow the sun, thereby significantly increasing their electricity production.
Our scope included the installation of the piles via pile driving, installation of the tracker system, and installing the modules.
Check out this video showcasing our work on the Brooks II project
Site surveying during pile installation to ensure accurate piling locations